A bout the water treatment plant the city of sterling has five 5 full time employees operating the water treatment facility and completed the third full year of the being online.
Sterling water treatment plant highland.
The 14 acre sterling natural resource center snrc advanced wastewater treatment plant in the city of highland california that will produce up to 10 million gallons of disinfected recycled water per day.
It is expected to be completed late 2021 to.
The sterling drinking water is taken from a system of 12 wells and distributed by approximately 86 miles of water mains.
After three years of planning east valley water district broke ground on its sterling natural resource center and is ready to begin construction on the 150 million waste water recycling plant at.
The wells are controlled by a scada system that will control each well such that the 4 storage tanks located in various locations of the city are maintained at a full level regardless of water demand.
Skip to main content.
The city of sterling has had no violations in 2016 and remains in compliance with colorado department on health and environment regulations.
The treatment plant is being built on the east lot and a public resource center emergency operations center will be built on the west side of del rosa.
The 126 million recycling plant in highland is expected to recharge the area s groundwater basinwith up to 10 million gallons of water daily and boost the region s water independence in the event.
The sterling natural resource center snrc will be a state of the art facility in highland california that will provide a sustainable new water supply to boost the region s water independence.
Softener carbon filter combo.
Building location 3035 highland park road highland il 62249not open to the publicsupervisor gary pughthe plant treats surface water drawn from silver lake.